Permit Applications, Worksheets, and Checklists
Building Development Services
Construction Related
Commercial
- Commercial Plan Review & Permit
- 2009 Fee Calculation Data
- Grease Interceptor Sizing Form & Guidelines
- Preapplication: New Development
- Redevelopment Review
- Fee Schedule, Pages 1-4
- Code and Zoning Plan Checklist
Residential
- 1 & 2 Family Dwellings Permit
- Residential Permit Fee Worksheet
- Accessory Strucure Permit
- Fee Schedule, Pages 5-7
Specialty Permits
- Floodplain
- Signs: Permanent | Temporary
- Wrecking
- Vendor Site
- Special Event
- Family Daycare Permit & Checklist
- Community Garden
- Fee Schedule, Pages 1-7
Trades
- Contractor-Master Registration
- Application Packet for Certification
- Apprenticeship
- Fee Schedule, Page 7
Administrative Rulings
- Certificate of Occupancy, AR2013-01
- Special Inspections Clarification, AR2013-02
- Sign Permits Clarification, AR2013-03
- Grease Interceptor Requirements Clarification, AR2013-04
Swimming Pools
- Barrier Height
- Barrier Construction: Vertical member spacing, horizontal member spacing less than 45"
- Barrier Construction: Vertical member spacing, horizontal member spacing 45" or more
- Chain Link Maximum Mesh Size
- Lattice Maximum Opening Size
- Gates: Latches at least 54" above gate bottom
- Gates: Latches less than 54" above gate bottom
- Door Alarms Requirements