|
Storm Water Services
Division Staff
In October, 2001, City Council
amended the City Code by enacting Chapter
96 Storm Water which consolidated all the existing storm
water regulations into one chapter and enacted a new article
dealing with discharges of pollutants into the municipal storm
water drainage system. Storm Water Services, previously part
of the Engineering Division, was elevated to Division status
in 2002.
- Harry Price, P.E., Assistant Director
of Public Works - Engineering and Storm Water Services
-
Todd Wagner, P.E., Principal
Storm Water Engineer
-
Keith A. Francis, P.E.,
Professional Engineer (Storm Water Capital Improvements)
- Julie Gimlin, Drainage Inspector
-
Errin Kemper, P.E., Professional
Engineer (Storm Water Capital Improvements)
-
Carrie Lamb, Storm Water
Technician (MS4 Permit/Water Quality)
- Aaron Nickolotsky, Storm Water Technician
(Land Disturbance Program)
- Sonny Decker, Storm Water Technician (Land
Disturbance Inspector)
- Kelly Short, P.E., Professional Engineer
(Storm Water Plan Review)
- Tyler Suda, GIS Technician
|