Inspection & Enforcement
Erosion/Sediment Control

Inspections

Inspections of erosion and sediment control BMPs are required at least once per seven calendar days, or within a reasonable time period (not to exceed 48 hours) of a rainfall event which causes stormwater runoff to occur on-site.The operator/permittee should consider developing comprehensive inspection procedures to address conditions at their site. These procedures include: formal and informal inspections, inspections before, during and after rain events, targeting certain BMPs or areas more frequently, and training staff and subcontractors.

Enforcement Across the Web


photo of manhole cover with words upstream starts here, protect our waterways stormwater engineering home

Contact Us

Environmental Resource Center
290 E Central Street Springfield, MO 65802
Tel: 417.864.1944