Doling Park Lake & Waterway Improvements

Doling Lake has been drained to allow for sediment removal, repair of eroded banks and replacement of the spillway Erosion in the waterway next to the lake will be repaired A rain garden will be constructed in this area to collect and filter runoff to protect the water quality of the lake. The lake is being dredged to remove accumulated sediment
Construction of walls around the edge of the lake