Hampton & Seminole

Project Facts

Plan No:
2019PW0033
Estimated Construction Start:
Summer 2022
Budget:
$634,000
Funding Source:
¼-cent Capital Improvement Sales Tax & Level Property Tax
Design Engineer:
Toth & Associates
Design Features:
The proposed design consists of underground stormwater pipe and inlets installed along S. Hampton Ave. and E. Seminole St. The new underground stormwater pipe network would replace undersized roadside ditches to provide enhanced stormwater conveyance. As part of the project, there are anticipated to be associated utility relocations and renewals for gas, water, and electric at specific areas within the project limits.
General Location:
The proposed project is generally located on S Hampton Ave. between E McGee Street and E Seminole St.
Map:
View a map of the area surrounding the S Hampton stormwater project.
Objectives:
The project is a result of long standing complaints of flooding of streets and private property. The objective is to mitigate localized flooding and retrofit the project area with underground stormwater infrastructure.
stormwater flooding yards in a neighborhood