Stormwater Detention Buyout (STM)
Payment in lieu of construction of detention facilities may be approved on a case by case basis, depending on downstream and other conditions. Cost of downstream improvements may be credited towards the payment in lieu of constructing detention. An application must be submitted and sealed by a qualified professional engineer licensed in the state of Missouri. Supporting calculations are required demonstrating that detention provides no downstream benefit.
Apply by uploading this document to the ePlans project

Show All Answers

1. Right of Way Excavation (EXC)
2. Sinkhole Permit (SNK)
3. Stormwater Detention Buyout (STM)
4. Stormwater (STM)
5. Sidewalk (SDW)
6. Encroachment (ENC)
7. Driveway (DRV)
8. Privately Developed Public Improvements (PWI/PIP)