  • Utilities are located prior to the start of clean up
  • Topsoil is ready for seeding
  • Placement area excavated soil that does not exceed non-residential screening criteria
  • Metal is one example of excavated waste
  • An excavator loads material for removal
  • Concrete is removed from under the viaduct
  • Digging a test pit
  • An erosion control mat is installed
  • Hydroseeding one of the placement areas
  • Hydroseeding has been done with native grasses
  • Exceedence pile soil which exceeds non-residential concentrations and will be capped in place
  • Excavating machines sit ready to clean up the West Meadows
  • A status update meeting takes place on site